Hose Prep

Step two in the groundthaw setup is the laying of hose. With the help of our powered spool trailer, our team lays out an even, organized grid of pipe which distributes heat over the frozen ground. Each loop is securely connected to a manifold which regulates proper flow. Once the loops are connected, the entire system is linked to the boiler and pressure tested to ensure leak free operation.

Previous
Previous

Boiler Delivery

Next
Next

Insulating